[Novice to buy cabinet manual] Ori Yubang cabinet order process

If you want to renovate, don't just look for the decoration company. Some materials have to be prepared in advance, such as cabinets. It is best to set them before starting work. The cabinet is a very complicated thing, the price ranges from thousands to tens of thousands, and the market is a lot of greasy. Therefore, you must be fully prepared before buying to avoid regrets afterwards. You may wish to look at the following netizen's experience in buying cabinets. There is also a reference example for buying cabinets yourself.

Step1: preliminary knowledge preparation

Buying cabinets can not be a battle of uncertainty. It is very necessary to understand the basic structure of the cabinets, the characteristics of the mainstream materials of the cabinets, and the way of calculating the cabinets in advance.

Step 1: Understand the structure of the cabinet

(A complete set of cabinets is composed of door panels, countertops, cabinets, hardware) >>> Learn more

Step 2: Understand the pricing method of cabinets

(Cabinet pricing is too much, which one of the two most popular pricing methods on the market is the most cost-effective?) >>> Learn more

Step2: buy cabinets in actual combat

When I really went to the market to pick cabinets, I found that paper was a little bit of a sense of learning. At this time, I could only choose one from the other by looking at and comparing more, and choose the cabinet product that suits me.

Step 3: Go to the market to choose cabinets

(It is recommended that you order the cabinets before starting work. Once the hydropower construction has begun, there are many restrictions when choosing cabinets to design) >>> Learn more

Step 4: Make a budget and make a quotation

(Whether it is the package price or the extended rice price, you must ask what is included and which is not included. You must also ask for the price of the light-emitting board, hardware, and electrical appliances in the later additions to avoid unnecessary overspending)

Step 5: Order and make an appointment for measurement

(The order only needs to pay a certain amount of deposit, generally ranging from 200-500 yuan, you can make an appointment to measure the time on the spot after the order, or you can make an appointment by phone afterwards)

Step3: Measuring and signing the contract

After the cabinet is set, you must promptly ask the merchant to come to the door for measurement. In the face of the designer, you must fully express your ideas and needs. When signing the contract, you must read the terms and conditions clearly.

Step 6: Initial test

(The initial test must be carried out before the construction of hydropower. Through the initial test, the general design of the cabinet and the layout of the water, electricity and gas can be determined)

The seventh step: out of the design plan

(According to the field survey situation and user needs to produce a preliminary design drawings and hydropower design drawings) >>> Learn more

Step 8: Review the size

(After the completion of water, electricity and ceramic tiles, you need to inform the business to send someone to review the size. At this time, it is the accurate production size. You must have the detailed dimensions of the hood, stove, and sink. > Learn more

Step 9: Adjust the design drawings and sign a formal contract

(The materials and specifications used in the contract should be standard. The specific meters and prices, including items with or without additional charges, are all clear, so as to avoid future additions) >>> Learn more

Step4: installation and acceptance

The quality of the cabinet is three-pointed, and the installation is seven-pointed. The installation process should be supervised throughout the process. Any dissatisfaction should be resolved on the spot.

Step 10: Installation

(The installation of cabinets of different brands is also different. Some of them assemble the cabinets and send them to the customers ’homes. Others directly bring all raw materials to the site for installation. The former saves time and reduces on-site garbage; the latter is more transparent and can be supervised throughout the process ) >>> Learn more

Step 11: Acceptance

(After the cabinet installation is completed, it is necessary to carry out a comprehensive and meticulous acceptance, so that problems can be discovered and resolved as soon as possible, to avoid future waffling) >>> Learn more

Step 12: Maintenance and after-sales

(Generally speaking, the warranty period of regular brand cabinets is five years or more, and the cabinets produced by small factories are less than five years, so it is difficult to keep up with the repairs if problems occur later)

Step 1: Understand the structure of the cabinet

A complete set of cabinets is composed of cabinet panels, door panels, hardware, countertops, and electrical appliances. The following figure can help you intuitively recognize the structure of the cabinet.

There are six common door panel materials for cabinets

1. PVC molded plastic board: it has the advantages of rich color and unique shape, and can be arbitrarily shaped.

2. Solid wood door: it has the effect of returning to nature and returning to the original, and it looks very good.

3. Double veneer panel: flat surface, not easy to deform, bright colors, wear-resistant and corrosion-resistant, and affordable.

4. UV board: The surface has high smoothness, the specular highlight effect is obvious, the color is full and attractive, and it will not fade after long-term use.

5. Baking paint board: bright color and strong visual impact, but high technical requirements, high scrap rate, and expensive price.

6. Crystal steel plate: It is actually made of tempered glass. The surface is hard and crystal clear, with rich patterns and easy to clean.

There are three common countertop materials for cabinets

1. Artificial stone countertop: The advantage is rich in colors and can be seamlessly bonded at any length. The disadvantage is that the texture is not natural enough, and the anti-scalding ability is slightly weaker. Suitable for users who focus on environmental protection.

2. Quartz stone countertop: The advantages are natural texture, hard texture, high temperature resistance, scratch resistance, and relatively low cost. The disadvantage is that the pores of the countertop are prone to breed bacteria, and seamless bonding cannot be achieved. Suitable for economic users who pursue the beauty of natural lines.

3. Stainless steel countertop: The advantage is that the texture is hard and easy to clean. The disadvantage is that the corners and joints lack effective treatment; they are easily scratched and difficult to repair. It is suitable for users whose home decoration style is more industrialized.

There are two common cabinet body board materials

Generally, there are two kinds of materials for the cabinet board, namely particle board and medium density board. The order of performance should be:

Imported particleboard → Particleboard produced by domestic big factories with imported equipment → MDF → Particleboard produced by domestic small factories

Types of cabinet hardware

Step 2: Understand the pricing of cabinets

Method one: Long rice pricing method: wall cabinet meter * wall cabinet unit price + floor cabinet meter * floor cabinet unit price + tableboard meter * tableboard unit price + (additional hardware, glass, lights and other accessories, you can not add ) = Total cabinet price.

Method two, cabinet pricing method: that includes cabinet cabinets, accessories, styles, models, etc., each standard cabinet has a corresponding clear quote, very clear. What is the price of each cabinet, is the configuration of the components inside reasonable, and the hinges, baskets, handles, etc. are all clear.

For example: a kitchen of about 8 square meters, cabinets are about 3 meters long, there are three sets of base cabinets, two sets of hanging cabinets. We can calculate its price in two ways.

Method 1: Yanmi pricing method: unit price of Yanmi × 3 meters, if 2000 yuan / Yanmi, the price of 3 Yanmi is 6000 yuan.

Method 2: The cabinet pricing method: the price of three sets of bottom cabinets + the price of two sets of hanging cabinets. For example, the price of a group of bottom cabinets is 1200 yuan, and the price of three groups is 3600 yuan; the price of a group of hanging cabinets is 800 yuan, the price of two groups of hanging cabinets is 1600 yuan, and the total price is 5200 yuan.

The pricing method of Eurory Yubang cabinets is the first one-the improvement of the Yanmi pricing method. Buy a floor cabinet and send a hanging cabinet. The total price of the cabinet is = the number of floor cabinets * the unit price of the floor cabinet + (additional hardware, glass, lights, etc. Accessories, you can not add), this pricing method has the advantage of simple calculation, easy for users to understand, and the quotation and the actual transaction price are small.

Step 3: Go to the market to choose cabinets

At present, there are many cabinet brands on the market, and the materials are also varied. The price ranges from a set of several thousand yuan to a set of several tens of thousands of yuan. So, as consumers, how do we choose satisfactory cabinets? First of all, the brand is very important. Good brands are more reassuring in terms of material control, cabinet design, and after-sales service. The editor recommends that you visit a few more stores, compare the product details of each brand and the quality of the clerk.

Let's take a UV paint cabinet of Euromonitor as an example. It is a multi-image and multi-angle real shot to tell you what details you need to see when choosing a cabinet:

Figure 1. Starting from the cabinet, you can see that the space design of this product is very good. The standard space of 800 * 340mm allows all the kitchen items to have living space.

Figure 2. The design of a full set of one-piece handles, the embedded structure is easy to open, and the whole kitchen gives a clean and neat feeling.

Figure 3. Each hanging cabinet is equipped with two lifting codes, so that the cabinet can withstand a weight test of up to 80 kg.

Figure 4. Although the dustproof corner is unremarkable, don't underestimate it. It can prevent dust from entering the corner, and cleaning the inside of the cabinet is no longer a headache.

Figure 5. The partition of the upper cabinet, a partition divides the space into two, and the storage of items is more orderly and clear.

Figure 6. This is a non-slip partition bar, aluminum alloy material, to prevent items from accidentally sliding down.

Figure 7. Looking at the door panel of the cabinet, the color is bright and the gloss is good, which makes the whole kitchen look glorious.

Figure 8. It is not enough to look at the surface. Open the cabinet. We can see that the cabinet body board is made of rubber wood heveaboard cabinet imported from Malaysia. It is an E1 grade environmentally friendly material. It smells almost tasteless.

Figure 9. The hinge is the most important hardware of the cabinet. Euromonitor uses the blum hinge imported from Austria, which can guarantee more than 200,000 openings and closings.

Figure 10. Moving the lens down again, what we see is the aluminum alloy baseboard of the cabinet, which is more moisture-proof and durable than the inferior plastic baseboard of some cabinets.

Figure 11. Not only that, there are aluminum alloy reinforcement bars under the sink and stove, and the invisible details can only reflect the brand's integrity.

Figure 12. The quartz stone countertop with 15mm thickness has higher density and hardness. Any large movements on the countertop need not worry about cracking.

Figure 13. Under the table, there is also a 16mm thick backing plate, which adds cushioning to protect the table from damage.

Figure 14. The rear water blocking design of the countertop against the wall to protect the wall from moisture erosion.

Figure 15. Pulling the drawer back and forth, it feels really smooth, there is no noise between opening and closing, and only the linked slide rail of Austrian bulm can do it.

Figure 16. There are too many large and small bowls in the kitchen. With this dish rack, you can make your own homes without disturbing each other.

Figure 17. There are too many pans to use in the kitchen. Put it in this flat basket if you can't use it normally!

Figure 18. Bottles, cans and jars of oil, salt, soy sauce and vinegar used to be placed on the countertop, which is easily contaminated to the countertop and accidentally spilled. !

Step 6: Initial test

The initial measurement refers to the measurement of the rough room. Through the initial test, the cabinet designer has a precise understanding of the structure of the house and the location of the pipes. At this time, according to the needs of customers, a kitchen plan can be made; at the same time, some details can be processed and coordinated with the home improvement staff.

Take a look at the following scene from a netizen's home inviting Ou Rui Yubang to come for the first test:

Figure 1, the staff came to the door with a measuring tool.

Figure 2. The staff is carefully listening to the owner's needs.

Figure 3. Observe and give guidance on the kitchen's water and electricity lines.

Figure 4. The initial test does not require particularly accurate numbers, so it didn't take much time to get it.

Figure 5. The master records the measured values ​​and combines the owner's personal needs with a rough plan in mind.

The seventh step: out of the design plan

Within three days after the initial test, the merchant needs to give the owner a preliminary design plan.

Let's take a look at the preliminary test drawings of Euromonitor that the netizen received that day:

This is the design plan given after the initial test, but there are a few places that are not very satisfactory. After the communication, the designer revised it, so I have the revised drawing below.

According to this plan, we have basically reached an agreement with Ou Rui Yubang. The sincerity of the other party also moved us. Basically, we decided to choose this and wait for the tile ceiling to be installed and then retest.

Step 8: Review the size

After the ceramic tile installation is completed, the ceiling installation is completed, and the kitchen appliances enter the field, you can notify the retest, and during the retest, you need to inform whether the under counter basin is installed, the precise height of the countertop, whether it is chamfered, etc.

Take a look at the retesting process of this netizen Ou Ruiyubang:

Figure 1. The store manager personally took part in the retest, and the whole process was meticulous.

Figure 2. Record while measuring, so the work efficiency is high.

Figure 3. The location of the gas meter and water pipe, especially the measurement accuracy.

Figure 4. The entire measurement is more time-consuming than the first initial measurement, and it took more than three hours, but the accuracy of the measurement is always better than the problem afterwards.

Step 9: Adjust the design drawings and sign a detailed contract

The drawings were sent the next day after the retest. The size of the drawings is much more accurate this time, so the drawings must be reviewed carefully.

Drawing 1

Drawing 2

Drawing 3

There are three pages of drawings. After the drawings are confirmed, a formal cabinet contract will be signed. At this time, full payment is required.

This is the situation where the store signs a contract.

When signing the contract, you must carefully read the nuclear price list to prevent future additions from exceeding the budget. Let ’s show you a similar board! page]

Step 10: Installation

After signing the cabinet ordering contract, the factory will produce the materials according to the size of the owner's re-measurement, and then the workers will deliver and install them. The installation of cabinets generally takes two days. The first day is the installation of the cabinet, and the second day is the installation of the countertops and electrical appliances. During the installation process, the craftsmanship and personal qualities of the installation master are very important and are the image of a brand.

The following is the installation process of a Eurobrush UV paint cabinet taken by a netizen:

Figure 1. The materials have entered the field, and all are packed in kraft paper to ensure that they will not be bumped during transportation.

Figure 2. The installation master is sorting materials. Large materials should be placed against the wall.

Figure 3. The cabinet has been assembled. Let's start with the cabinet panel.

Figure 4. Let's take a look at the nails made by the master.

Figure 5. Start to assemble, let's start from the lower cabinet!

Figure 6. The bottom of the lower cabinet is covered with moisture-proof aluminum foil, which looks silvery.

Figure 7. All the small objects are packed in Plastic Bags . The bags are filled with cabinet legs, which look like plastic.

Picture 8. All the feet are installed smoothly, and the master starts to punch holes in the cabinet body.

Figure 9. All exposed edges and holes are wrapped with aluminum foil. This detail is very important.

Figure 10. Looking at the effect of wrapping aluminum foil, it is still very smooth.

Figure 11. Other cabinets have been assembled according to the drawings. At first, I saw so many boards, and I was worried that they would be confused. As a result, I saw the drawings taken by the master.

Figure 12. Three hours have passed, look at the effect of the assembly, not bad!

Figure 13. Install the relatively easy main cabinet structure first, and then prepare the damping and lifting codes.

Figure 14. It is more troublesome to install the cabinet, because if it is fixed on the wall, it will shake or even fall if it is not fixed well.

Figure 15. Small accessories for Shenma, and drills for nailing.

Figure 16. The expansion screws of the hanging cabinet are started. A cabinet needs to be screwed like four expansion screws.

[

Figure 17. This wall cabinet by the window can be installed.

Figure 18. The other cabinets next to each other are also installed in sequence.

Figure 19. Finally, the doors and hardware of each cabinet were installed. The first day of work was completed. It took more than 8 hours. The master ’s craftsmanship did not have to be said. The whole process was meticulous and the scene was not what I imagined. The mess in the.

Figure 20. The next day the table was installed, and I changed a master. Because the cutting dust on the table is relatively large, I simply took two pictures.

Figure 21. Finally, the countertop sinks are all installed. Yesterday, I looked at the clean cabinets. Today, they were gray, but in the end, the master helped to clean them very carefully.

Step 11: Acceptance

Acceptance is the last and most critical step in cabinet consumption. Whether the installation of the cabinet is in place is not only directly related to the beauty of the cabinet, but also whether it is satisfactory for future use. The following are some experiences that can help you understand the standards and precautions for cabinet acceptance:

1. The cabinet and table surface are smooth and free of bumps, scratches, cracks and other damage.

2. The installation position of the cabinet is in accordance with the design drawings and cannot be changed at will.

3. The cabinet body, countertop and hanging cabinet shall be level after being combined.

4. Fine-adjust the door panel to ensure that the door panel is flush with the front, back, front and left, and the gap is even.

5. Door and frame, door and door, drawer and cabinet, drawer and door, drawer and drawer adjacent surface gap ≤ 2MM.

6. The wall cabinet and the wall are firmly installed, with no less than 2 connection fixing points per 900MM to meet the load-bearing requirements.

7. The countertop and cabinet are firmly combined without looseness.

8. At the connection between the rear water barrier and the wall surface, the stainless steel sink and the countertop, seal with sharp sealant.

9. There should be no splicing seams on the artificial stone table.

10. The joints of the built-in stove and tabletop should be combined and leveled.

11. The sharp angles of all cabinets should be blunt, and metal parts that can be touched by humans must not have burrs or sharp angles.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

If you are interested in brand cooperation, content cooperation, and advertising of this website, please send an email to :.

Cabinet overall cabinet custom cabinet door price electrical space home decoration paint decoration decoration decoration company ok decoration style glass brick drawer cabinet cabinet door cabinet door glass cabinet stainless steel cabinet floor cabinet cabinet door panel kitchen cabinet door cabinet glass door kitchen glass sliding door tile adhesive tile price kitchen tile Tile specifications

Welcome to our Our Cellophane Bags pages. Our products include plastic bags, PP bags, Cellophane Gift Bags, OPP bags, shopping bags, T- shirt bags, bubble bags, zipper bags, plastic handbags, plastic film, shrink film and non woven bag. Our products are used to packing toys, garments, cards, glasses,shopping and so on. 

We have important business of Cellophane Packaging Bag and Cellophane Candy Bag in oversea market with high quality and reasonable price. With good employees who have enough experiences and advanced machines, we can supply plastic bags according to customers' need. 

Our objective is "customer first, quality first, prestige first". Welcome you to make business with us. Contact me today for details.


Our company has many regular clients in domestic market. Our Clear Cellophane Bag and Cellophane Candy Bag were sold to more than 40 countries and regions, such as Southeast Asia, the Middle East, Africa, the EU and North America. We have a professional sales team, a product development team and well trained workers. Our company aims at creating more values for our partners, making more benefits for society and creating more opportunities for workers. There are totally 235 staff members in our company. We attained ISO9001 in 2004 which provides solid foundation for our further development. Persisting in "High quality, Prompt Delivery, Competitive Price", we have established long-term cooperation with clients from both overseas and domestically and get new and old clients' High comments. It is our great honor to meet your Cellophane Candy Bag demands. We are sincerely expecting your attention. 


Cellophane Candy Bag

Cellophane Bags

Clear Cellophane Bag,Cellophane Gift Bags,Cellophane Candy Bag,Cellophane Packaging Bag

WenZhou JinYuan Packing Manufacture Co.,Ltd , https://www.tote-shoppingbag.com